Data Centre – London
Data Centre – London required Mercury Power to swap out old out of date switchgear and UPS systems in a key critical electrical system. This system supports all the key fibre connections to the entire data centre. Mercury Power designed the system to enable the no break transfer between the old and new equipment.
We installed the new switchgear inside the existing UPS room and added new Mains and Generator supplies from their existing main LV Switchgear. These runs were approximately 120 meters and included all the Mains / Generator Controls. The new systems were commissioned and set up in parallel to the existing, we then ran the generators up to sync the supply source and then migrated the system across. Once completed we removed the old switchgear and UPS systems. This project was completed in a tight timescale to work around clients work freezes.
The works were completed during normal working hours.
The client is more than happy to discuss this project. Contact details can be provided upon request.
Talk to a Mercury Power installation specialist today