AQL Data Centre Leeds
Installation of a 605 kVA Three Phase and Neutral Open Skid Generator utilised to provide emergency power back-up for a Data Centre. This is the first of 3 units to be installed and synchronised. All Cabling was run in AWA single core cables with additional mechanical protection afforded with ladder rack.
The unit had to be designed with airflow considerations of being placed into a room with a view of a further 3 units to be installed with the third unit being placed on steel work above the first unit. Very complex positioning of the unit into the room with specialist plant movement required.
A 605 kVA Himoinsa Open Skid unit with a Turbo intercooled MTU power plant. The unit was modified with additional load MCCB’s for multiple loads and direct load bank termination. The Exhaust system has been modified to suite its location and the difficult surroundings. The radiator was modified to make allowances of the restricted incumbent ambient existing airflow. A Deep sea controller was fitted on the unit and ATS. This unit had full Volt Free BMS and SNMP interface and its monitored 24 / 7.
Talk to a Mercury Power installation specialist today